WLK Joint Venture
Copy right @ 2008, All Rights Reserved

July 21, 2010 4:37 PM
Site Developed by:Tonya Winebarger


Additions and Modernizations to White Pass Elementary School, Randle, WA..- Open Bid Package Results for July 20, 2010

 

 




For individual results of each bid package, click on the link pertaining to the trade in reference. Results will be posted ASAP. Please check back.
Any bid marked NR
means it was a Non-Responsive bid.

BID PACKAGE   DIVISION DESCRIPTIONS

Bid Package

1

HAZARDOUS MATERIAL ABATEMENT

Bid Package

2

BUILDING DEMOLITION

Bid Package

3

DEMOLITION
Bid Package
4
EARTHWORK
Bid Package
5
ASPHALT PAVING
Bid Package
6
CONCRETE CURBS & SIDEWALKS
Bid Package
7
LANDSCAPING
Bid Package
8
CHAIN LINK FENCING & GATES
Bid Package
9
STRUCTURAL CONCRETE
Bid Package
10
STEEL FABRICATIONS/ERECTION
Bid Package
11
WOOD FRAMING
Bid Package
12
INTERIOR ARCHITECTURAL WOODWORK
Bid Package
13
BUILDING INSULATION
Bid Package
14
SIDING
Bid Package
15
ROOFING & GUTTERS
Bid Package
16
DOORS, FRAMES, AND HARDWARE
Bid Package
17
VINYL WINDOWS, GLASS, AND GLAZING
Bid Package
18
OVERHEAD COILDING DOORS
Bid Package
19
METAL FRAMING AND GYPSUM BOARD ASSEMBLIES
Bid Package
31
FIRE SPRINKLERS
Bid Package
32
PLUMBING
Bid Package
33
HVAC
Bid Package
34
ELECTRICAL
Bid Package
35
ROOF SMOKE HATCH VENTS
Home